Clarion Hotel Refurbishment, Dublin

Customer
Kingsoak Taverns Ltd.
2 Grand Canal Square, Dublin 2

Construction Period
June 2015 – September 2015

Design Team
Architect
Henry J Lyons Architects,
51 – 54 Pearse Street, Dublin 2

Fire Consulting Engineers
Michael Slattery & Associates,
19 Windsor Place,
Dublin 2

Project Managers & CostConsultants
Virtus Contracts Management,
11 The Crescent,
Limerick

Our project works involved extensive surveying of the existing structure in order to allow the Design Team to quantify the fire proofing omissions.
All Bedroom corridors & Riser shafts were fireproofed retrospectively over five floors. This included the removal of various services in order to get adequate access, together with reinstatement & commissioning on completion. Fire rated doors, ironmongery & glazed panels were installed in place of non-fire rated products.

• All of the works were carried out without obstructing Hotel Customers & Staff.
• Work areas were pre-agreed so that Hotel reservations were fully aware of work areas.
• All bedrooms remained in use throughout the works.
• All fire proofing installations were surveyed, photographed & signed off on a weekly basis by MSA Fire Consultants.

Download Project

Call Us Map